A Completeness-Based Framework for Assessing Construction Daily Activity Reports: Information Quality, Timeliness, and Traceability
Domingo Gaces Samontina, Jr. Independent Researcher, Construction Information Management Abstract— Daily Activity Reports (DARs) are contemporaneous construction records used to document site activities, resources, working conditions, progress, inspections, safety events, delays, instructions, and other factors affecting project execution. This paper proposes a structured framework for assessing DAR completeness and information quality. The framework introduces a weighted DAR Completeness Score (DCS) based on fourteen categories: report identification; weather and site conditions; work activities; quantitative progress; manpower; plant and equipment; materials; quality and inspection; safety and environmental information; delays and constraints; instructions and communications; photographic evidence; action ownership; and verification. Each category is rated on a five-level scale and converted into an overall score from 0 to 100. Submission timeliness and reporting continuity are assessed separately to distinguish document availability from content completeness and punctuality. The framework is grounded in literature on construction daily-report analytics, multimodal evidence, quality knowledge management, intelligent information systems, and electronic document management. It is intended to strengthen progress verification, productivity assessment, quality and safety monitoring, delay analysis, claims substantiation, and data-driven project control.
By Domingo Añasco-Gaces Samontina, Jr.about 21 hours ago in Writers
Tinipak River and Limestone Rock Formations in Daraitan, Tanay, Rizal: A Photo-Assisted Field Observation of Karst Landscape, River Processes, and Ecotourism Management
(2) Tinipak River and Limestone Rock Formations in Daraitan, Tanay, Rizal: A Photo-Assisted Field Observation of Karst Landscape, River Processes, and Ecotourism Management
By Domingo Añasco-Gaces Samontina, Jr.about 21 hours ago in Writers
My Cataract Operation Experience
My Cataract Operation Experience Peasley Cross Teaching Hospital, St Helens, Merseyside Uk I would like to share my experience with anybody who is waiting to have a cataract operation. I hope that by telling my story, I might help to reassure somebody who is feeling frightened or anxious about what lies ahead.
By ♿ V+ Marie381Uk a day ago in Writers
Development and Evaluation of an Automated Master Document Register for Enhanced Traceability, Workflow Control, and Information Governance in Construction Projects
Domingo Gaces Samontina, Jr. - Documentation Advisor, Developer, and Register Owner, Automated Comprehensive Master Document Register (ACMDR)
By Domingo Añasco-Gaces Samontina, Jr.a day ago in Writers
Assessing EDMS Data Quality, Traceability, and Governance Readiness: An Empirical Audit of Autodesk Construction Cloud Transmittal Metadata
IEEE-STYLE EMPIRICAL RESEARCH PAPER Domingo Gaces Samontina, Jr. November 2026 DATA AND CONFIDENTIALITY NOTE - This study uses an anonymized Autodesk Construction Cloud (ACC) transmittal export as its empirical source. Findings are bounded by the fields and snapshot available in that export. Project organizations are represented only as Contractor, Consultant/Engineer, and Client/Employer. Personal names, document identifiers, transmittal numbers, file paths, and project-identifying details are excluded.
By Domingo Añasco-Gaces Samontina, Jr.a day ago in Writers
TRACE-NCR: An Evidence-Gated Framework for Construction Nonconformance Control, Register Integrity, and Organizational Learning
Domingo Gaces Samontina, Jr. Independent Researcher, Construction Information Management Abstract— Nonconformance report (NCR) systems frequently record deviations without ensuring that response, causal analysis, corrective action, verification, and closure evidence are complete. This paper develops TRACE-NCR, an evidence-gated framework that makes register integrity the control surface for nonconformance management. A retrospective audit of seven construction NCR observations was used as a bounded diagnostic case. Five records had calculable response dates, with intervals of 0, 1, 2, 3, and 9 calendar days (median 2; mean 3.0). Root cause, corrective action, and preventive action were documented in 85.7%, 71.4%, and 57.1% of records. Although all records were marked closed, only one contained a closeout acceptance date. Two identifiers were reused, and the elapsed-time formula was reversed. TRACE-NCR organizes six gated stages—Identify, Contain, Analyse, Act, Verify, and Close and Learn—around four information-quality dimensions: timeliness, completeness, uniqueness, and status–evidence consistency. A conceptual model, five-level maturity model, audit checklist, and managerial roadmap are proposed. The contribution is not population inference from a small case; it is a transferable control architecture for converting passive registers into auditable quality intelligence.
By Domingo Añasco-Gaces Samontina, Jr.2 days ago in Writers
THE USE OF A.I. - A PERSONAL STATEMENT
The modern witch hunt is still in full swing and is increasingly dividing the writing community. Everyone is entitled to think whatever they like about A.I., but they should jolly well treat their opinion as exactly that: an opinion, rather than presenting it as an established fact.
By Christian Bass7 days ago in Writers
How I learned to Recognize the signs of a Hacking attempt. 🔐🔐🔐🔐🔐
Maybe we should all attend " The University of Hackers, Thieves and Criminal, Immoral and Heartless Masterminds" . Or set up huge businesses, like in China and elsewhere, where they hire smart people and train them in the ins and outs and clever nuances of how to rob the hardworking and totally unaware mass of their life savings.
By Novel Allen7 days ago in Writers